Ace Tyres Great Yarmouth

Location: Great Yarmouth
Project: 2 Post Lift Supply + Installation

Ace Tyres in Great Yarmouth were looking for a way to increase their tyre changing capacity but they had very limited space available.

So ISN Garage Assist installation engineers Nigel O'Neil and Sam Orr came up with a solution that enabled them to install 2 megalift 4000-3 Two Post Lifts in a tight area between the MOT bay and the wall.

To get the lifts in but ensure that the installation was compliant, they installed both lift control boxes directly to the wall, creating the required space between the lift columns and the wall.